Services

Two core services: scheduling and cost.

Project scheduling and project cost control share one structure, one calendar and one set of assumptions, so your schedule and your cost reports agree. Procurement and equipment support are available on request.

Schedule recovery view: total float moving from minus 268 days to plus 5 days as a matched delivery is scheduled

Project Controls & Scheduling

A credible plan and a forecast leadership can rely on.

Primavera P6 schedules that reflect how the work will actually be engineered, bought, built and commissioned, with logic, calendars and constraints that hold up to review.

  • Integrated EPC schedules and baselines in Primavera P6
  • Critical path, near-critical and float analysis
  • Weekly and monthly progress updates with variance narratives
  • Recovery planning, compression options and lookaheads
  • Schedule health checks and forecasting

Best when dates keep moving without a clear reason, or the schedule no longer matches the field.

Ask about scheduling
Cash-flow view aligning vendor payments with owner funding dates

Project Cost Control & Reporting

Cost visibility that matches physical progress.

Reporting that connects budgets, commitments, actuals and forecasts to the same progress your schedule shows, delivered on a calendar built around month-end close.

  • Budget, commitment, actual and forecast-at-completion tracking
  • Progress inputs aligned with cost and billing cutoffs
  • Earned value and variance reporting
  • Cash-flow outlooks from the cost-loaded schedule
  • Concise reporting packs for project and finance leadership

Best when project and finance teams report different numbers for the same project.

Ask about reporting

Available on request

Support that protects the schedule when procurement or equipment drives the critical path.

Engineer inspecting medium-voltage switchgear during a factory acceptance test

Procurement & Vendor Coordination

The right supplier, on terms that fit your schedule and cash flow.

Specialized sourcing and vendor management for engineered and long-lead packages, with delivery and payment milestones tied to when the work needs them.

  • Specialized sourcing and vendor evaluation
  • Bid comparison on total delivered cost and lead time
  • Vendor data, drawing approval and FAT tracking
  • Expediting and delivery tracking against required-on-site dates
  • Payment-term coordination aligned with the billing cycle

Best when long-lead items drive your critical path, or vendor payments land before you are funded.

Watch the 41-second film Ask about procurement
A verified equipment match selected from available options

Equipment & Asset Solutions

Unused on one project. Valuable on another.

We connect surplus project materials and specialized equipment with buyers or redeployment opportunities, and show what an available unit means for the buyer's schedule.

  • Confidential matching of surplus equipment with buyers
  • Redeployment across an owner's own project portfolio
  • Specification and documentation review coordination
  • Inspection, testing and logistics coordination
  • Schedule impact assessment of available alternatives

Best when equipment is stranded by a cancelled or changed project, or a needed unit is quoted years out.

Watch the 60-second film Ask about equipment

How the services connect

One late transformer. Four decisions, made together.

An example of how a single procurement delay moves through a project, and where each service acts.

  1. Schedule

    Re-run the critical path, measure float erosion and identify which energization and commissioning milestones move.

  2. Cost

    Update the forecast, extended overheads and the timing of vendor payments against expected collections.

  3. Procurement

    Confirm the vendor's recovery plan, expedite, and test whether payment milestones should follow the revised delivery.

  4. Equipment

    Search for an available unit that meets the ratings, and show how many weeks it would recover.

Example scenario for illustration. It does not describe a specific client project.

Reporting approach

What a connected monthly view looks like.

A sample of the reporting we build: schedule, cost and long-lead equipment on one page, so leadership sees the cause and the consequence together.

Illustrative exampleSample data only. Not client results and not a live software platform.
Forecast completion12 days lateworking days vs. baseline
Schedule performance (SPI)0.94earned ÷ planned
Cost performance (CPI)0.99earned ÷ actual
Forecast at completion$48.4Mbudget $47.9M
Cumulative progressPlanned Actual Forecast
Long-lead equipmentRequired on site vs. vendor forecast
ItemNeedForecastFloat
Main power transformerMar 02Mar 20−14d
MV switchgearFeb 09Feb 03+4d
Standby generatorsApr 13Apr 06+5d
UPS modulesMar 16Mar 18−2d
ChillersFeb 23Feb 16+5d
Cost position by areaCommitted and forecast as a share of budget

Procurement and cash flow

A procurement decision is also a timing decision.

Contractors often pay vendors before the owner funds the matching pay application. Try a single payment to see the funding gap that timing creates, and what it costs to carry.

Simplified, single-payment illustration. Excludes deposits, retention, taxes and collection risk.

Funding gap45 days
Estimated carrying cost$9,431