Schedule Health Check
Schedule rejected? Know exactly why in 5 business days.
A fixed-price review of your Primavera P6 schedule, worked activity by activity by a scheduler with 8+ years across data centers, oil and gas, and EPC projects. You get the problems ranked, the fixes tied to activity IDs, and a one-page Vital Signs report your PM can read in two minutes.
How the 5 days run
$2,500 fixed for the first 5 founding clients, then $3,500 · NDA before any file is shared · At least 10 issues worth fixing, or you don't pay
Book a Health CheckSample deliverable
One page your PM can read in two minutes.
The Vital Signs report shows where the schedule stands, why it was rejected, and the fixes in the order that matters.
- Critical path traced and explained in plain words
- Float, open ends, constraints and lags scored against DCMA 14-point checks
- Long-lead items that drive the finish, called out by name
- Top 5 fixes, each tied to an activity ID
Schedule Vital Signs
Electrical subcontract · Data date 25-Nov-26Why it was rejected. The finish is held by a constraint on energization, not by logic. Switchgear delivery has no link to installation, so the real path to energization is hidden.
Top 5 fixes
- Remove the Must Finish By constraint on E-4100 and let logic drive it
- Tie switchgear delivery E-2210 to set-in-place E-3050
- Close 41 open ends; 12 sit on the critical path
- Replace three 20-day lags with real activities
- Split cable pull E-3300 by area to match the GC's sequence
Schedule Health Tracker
Is your schedule running behind? See it in 60 seconds.
Enter two dates and tick what applies. The tracker shows how far behind you are today, the risk your dates don't show yet, and whether your next submittal is likely to pass.
A quick self-assessment, not a schedule analysis. The Health Check reviews your actual P6 file.
The cost of a late schedule
What are those days costing you?
A weak schedule doesn't just move dates. It runs up damages, site overhead and idle crews every day the finish slips. Put in your own numbers and see what the delay is costing, and what recovering even a few days is worth.
Cost of the delay
$262,500
- Liquidated damages
- Site overhead
- Idle labor and equipment
Each day late costs
$10,500
Winning back 5 days saves
$52,500
A $2,500 Health Check costs less than 6 hours of this delay.
Book a Health CheckFind the real critical path early, while there is still time to recover the days instead of paying for them.
Every day saved is a day of supervision, trailers, rentals and insurance you don't pay for.
Logic that matches the field means trades arrive when the work is ready, not to stand and wait.
Long-lead items tracked to their need dates, and surplus options found when a delivery slips.