Data center hall at night, rows of liquid-cooled server racks with a chartreuse line of light down the aisle

Data centers

Energization dates are won in the schedule.

Integrated schedules that tie power, cooling and long-lead equipment to commissioning readiness.

Power transformer in a substation at blue hour, crossed by a chartreuse alignment laser

Substations & transformers

Long-lead power equipment, tracked to the day you need it.

Procurement milestones linked to required-on-site dates, float and payment terms.

Chemical process plant with distillation columns and pipe racks at night, crossed by a chartreuse laser line

Chemical & process

Process plants run on interfaces. So should their schedules.

IFA, IFD and IFC deliverables, vendor data and construction releases in one logic network.

New medium-voltage switchgear lineup on a clean warehouse floor in daylight

Switchgear

Available equipment can save months, when it truly fits.

Surplus and redeployment options checked against ratings, documentation and your schedule.

Engineers reviewing a large-format drawing in a site office at night

EPC delivery

Progress you can measure, forecast and bill on.

Objective progress, earned value and cost forecasts aligned with your month-end close.

Industrial construction site with tower cranes and structural steel at dusk

Construction

Field reality and the forecast, finally in step.

Lookaheads, recovery planning and forecasts that reflect what is happening on site.

Late schedules cost money. We find the lost days before you pay for them.

Primavera P6 schedule rescue and project controls for data center and industrial projects. Fixed price, 5 business days, under NDA.

What we do

Two services. One goal: finish on time and on budget.

Poor scheduling turns into cost. We control both: the schedule that sets your finish date, and the cost reporting that shows what every delay is worth.

01 · Time · Start here

Schedule Health Check

Schedule rejected or slipping? Know exactly why in 5 business days. Problems ranked, fixes tied to activity IDs, and a one-page Vital Signs report.

$2,500 fixed · 5 business days · NDA · 10 issues or you don't pay

  • Logic, open ends, constraints, leads and lags
  • Critical path and float analysis
  • Long-lead items that drive the finish
  • Primavera P6 or Microsoft Project
Then, if you need it Project Scheduling Recovery plans, baselines, monthly updates, lookaheads and narratives, quoted from your Health Check findings.

02 · Cost

Project Cost Control

Cost reporting that matches physical progress, so you see overruns and the price of delay before they land.

Try it now Cost of delay calculator See what every day late costs your project
  • Earned value and progress-based cost forecasts
  • Budget, commitments and variance reporting
  • Cash flow aligned with vendor and owner payments
  • Cost of delay and recovery options in dollars

The cost of a late schedule

Every day late has a price. See yours.

A weak schedule doesn't just move dates. It runs up damages, site overhead and idle crews every day the finish slips. Put in your own numbers and see what the delay is costing, and what recovering even a few days is worth.

Example figures. Replace them with your project's numbers; nothing leaves this page.

Cost of the delay

$262,500

  • Liquidated damages
  • Site overhead
  • Idle labor and equipment

Each day late costs

$10,500

Winning back 5 days saves

$52,500

A $2,500 Health Check costs less than 6 hours of this delay.

Book a Health Check
Avoid liquidated damages

Find the real critical path early, while there is still time to recover the days instead of paying for them.

Cut extended site overhead

Every day saved is a day of supervision, trailers, rentals and insurance you don't pay for.

Stop paying idle crews

Logic that matches the field means trades arrive when the work is ready, not to stand and wait.

Skip expediting premiums

Long-lead items tracked to their need dates, and surplus options found when a delivery slips.

Our value proposition

INFRACHRON connects time, cost, procurement and equipment decisions to give complex projects a clearer path to delivery.

On most projects these decisions sit with different teams, in different tools, on different calendars. A late transformer is a schedule problem, a cash problem, a vendor problem and an equipment problem at the same time. We work across all four, so the decision is made once, with the whole picture.

Concept view: one decision date across four workstreams
Time
Cost
Procurement
Equipment
When schedule, cost, procurement and equipment are read together, one decision date resolves all four.

Not sure where to start? Start with a Health Check.

Founding offer: $2,500 for the first 5 clients, then $3,500. At least 10 issues worth fixing, or you don't pay.

Book a Health Check $2,500 · 5 days